![]() |
|||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||
The Future? The main A5 serves not only as the link from Omagh to Londonderry and from Omagh to Belfast, but also from Dublin to Londonderry. There have been repeated calls to upgrade the A5 to dual carriageway, but currently traffic volumes do not seem to justify it. Having said that, the desire of the Irish government seems to be stronger than the Northern Ireland government, since the former sees it as a link between two cities whereas the latter sees it as the route linking Omagh to the rest of the province. If this scheme does go ahead, which is unlikely before 2020, it will mean building a new dual carriageway bypass of Omagh since most bridges on the Throughpass were built to single-carriageway standard. Photos
Looking north east along the new Omagh Throughpass from the Crevenagh Road roundabout on 9 Aug 2006. The Drumragh River is to the right. [Photo by Matthew Hagan]
Looking south west towards the new Crevenagh Road roundabout with the Drumragh River bridge and then the Dublin Road cutting ahead. [Photo by Matthew Hagan]
The new Drumragh River bridge carrying the Omagh Throughpass over the river, seen on 9 Aug 2006. [Photo by Matthew Hagan]
Approaching the Dublin Road cutting from the north. This junction is grade-separated with the southbound offslip heading up on the left. I'm not sure who the dog is. [Photo by Matthew Hagan] |
|||||||||||||||||||||||||||